Compact Substation Specification Status Ledger
Assign an evidence state to each quoted field. The ledger separates supplied facts, engineering options, project conditions and unsupported claims.
0Source-supported
0Configurable
0Project-dependent
8Not evidenced
| Quoted field | Current evidence state | Buyer verification |
|---|---|---|
| Capacity and voltage | Match the exact datasheet value and conditions. | |
| MV and LV equipment | Request the equipment schedule and one-line. | |
| Protection and control | Map devices, settings and study ownership. | |
| Enclosure and environment | Check materials, protection, access and site duty. | |
| Applicable standards | Map edition, product scope and destination market. | |
| Tests and certificates | Request report number, model mapping and issuer. | |
| Price and delivery | Record inclusions, assumptions and milestones. | |
| Warranty and after-sales | Attach the offered terms and service boundary. |
Eight fields remain unevidenced. Start with the exact model, project standard and document register.
Ledger rules
Used correctly, this ledger lets engineering, quality assurance and procurement separate a value copied from the source document from an option still needing design confirmation, a condition controlled by the site or utility, and a marketing statement that has no model-level evidence, so each open record keeps an owner and a next action before supplier approval.
- Capacity needs a traceable model or project record.
- Voltage requires the applicable system and equipment context.
- Switchgear scope belongs in a controlled equipment schedule.
- Relay and fuse claims need devices, functions and study ownership.
- Environmental claims require the stated enclosure duty and evidence.
- Standards must match the product category and edition.
- Certificates should identify the model, issuer and scope.
- Report-backed testing needs an agreed inspection plan.
- Pricing must list inclusions, exclusions and assumptions.
- Delivery dates depend on approvals and release conditions.
- After-sales terms belong in the offered commercial record.
- Options remain configurable until engineering confirms them.
- Site duties stay project-dependent until inputs are frozen.
- Unsupported claims remain open instead of being averaged.
- Comparisons work only after evidence states are normalized.
- Procurement can copy the ledger into supplier review.
- Quality teams can assign owners to open records.
- Approval still follows the project and utility route.