Compact Substation RFQ Readiness Score

Check only the inputs your team can support today. The score measures enquiry completeness, not product fit, compliance or approval.

How the score should be used
  • Country and utility inputs set the approval context.
  • Load data gives the rating review a defensible basis.
  • Voltage details prevent a winding or equipment mismatch.
  • Network arrangement defines the incoming switching question.
  • Protection information exposes study and device boundaries.
  • Access conditions affect doors, clearances and maintenance.
  • Foundations and cable entries control physical interfaces.
  • Evidence requirements define drawings, tests and records.
  • Logistics scope separates factory supply from site work.
  • Schedule inputs expose approvals and witness dependencies.
  • Unknowns should remain visible instead of becoming assumptions.
  • Checked fields still need supporting files where applicable.
  • Missing fields become the next enquiry actions.
  • Copying the list creates a simple internal handoff.
  • Attachments turn checklist answers into reviewable evidence.
  • Suppliers should receive the same controlled input set.
  • Engineers confirm fit after the checklist is complete.
  • Approval remains with the applicable project parties.