Visual replacement-risk estimator

Replacement Transformer Compatibility Bottleneck Mapper

Mark the evidence status for five decision domains. “Open with owner” means the gap is documented and assigned; it does not mean the issue is resolved.

01

Existing asset

Nameplate, drawings, condition, failure context and outage boundary.

02

Physical fit

Footprint, pole or pad interface, bushings, terminals, cable reach and handling.

03

System studies

Ratio, impedance, grounding, fault duty, protection and parallel-operation review.

04

Site interfaces

Access, clearances, fire, flood, seismic, sound and environmental responsibility.

05

Acceptance

Tests, deviations, destination evidence, approval records and release documents.