Factory-to-Site Responsibility Map
Assign a proposed owner to each interface group before design freeze. Its result exposes open responsibilities; it does not create contractual obligations.
Assign the working responsibility
Carry the same split into project documents
Place every assigned owner beside a required input, output, due date, and acceptance record. Match the result across the single-line diagram, equipment list, general arrangement, interface drawings, quotation, packing plan, FAT/SAT schedule, and commissioning plan. Keep labor, tools, lifting equipment, test instruments, temporary power, consumables, permits, and safety control visible. Resolve an open group before it can hide inside another party’s price. Treat a joint group as an interface to define, not as shared responsibility without an owner. Record deviations. Confirm witnesses. Name the energization authority. Preserve the agreed version with the contract file.
Result boundary: the bars count six selected interface groups and make no claim about legal responsibility, project readiness, supplied equipment, site service, price, or schedule. Final quotation and technical agreement control.

![Pad-Mounted Transformer: How It Works [2026 Guide]](https://toplit-transformer.com/wp-content/uploads/2026/08/pad-mounted-transformer-guide-featured-150x150.png)


![Single Phase Pad Mounted Transformer Guide [2026]](https://toplit-transformer.com/wp-content/uploads/2026/08/single-phase-pad-mounted-transformer-guide-featured-1-150x150.png)