Get in touch with Talite Transformer Co., Ltd Company

Contact Form 使用中

Two-Quote Scope Alignment Matrix

Mark each field as confirmed, open, or excluded in two supplier proposals. The result identifies where a price comparison is premature because the technical, evidence, or delivery scope is not aligned.

Comparison field Proposal A Proposal B Why it matters
Rating, voltage, frequency, phase, vector group Sets the electrical baseline.
Impedance, taps, grounding, fault duty Changes system and short-circuit fit.
Guaranteed no-load and load loss Controls energy and efficiency comparison.
Loss reference temperature and tolerances Prevents unlike test values from being ranked.
Cooling, enclosure, altitude, environment Changes thermal and physical design.
Outline, mass, access, lifting, sound Controls installation feasibility.
Core material and material traceability Connects the proposed design to evidence.
Routine, type, special, witness tests Changes acceptance cost and proof.
Drawings, manuals, certificates, reports Defines the approval package.
Accessories, monitoring, spares Changes supplied functionality.
Packing, freight, Incoterm, destination Changes landed scope and risk.
Schedule, warranty, commissioning, support Defines the commercial boundary.

Scope alignment result

Aligned fields0
Open fields0
Mismatched fields0

Items to resolve before commercial ranking

    Request a Scope-Aligned Proposal →

    A matching status does not prove that values, tolerances, editions, or acceptance criteria are identical. Compare the underlying data sheets and contract language.