Factory-to-Site Responsibility Map

Assign a proposed owner to each interface group before design freeze. Its result exposes open responsibilities; it does not create contractual obligations.

Assign the working responsibility

Electrical equipmentTransformer, HV/LV equipment, protection, control, metering, and internal cabling.
Enclosure and layoutInternal arrangement, access, ventilation or HVAC, foundation, and clearances.
Earthing and cablesInternal earth provisions, earth grid, cable entry, external cables, and terminations.
Inspection and testingITP, factory checks, FAT, site tests, settings, witnesses, and acceptance records.
Delivery and installationPacking split, route, permits, unloading, lifting, assembly, and civil readiness.
Commissioning and supportSupervision, labor, instruments, training, spares, energization, and handover.
Working scope distribution

Six interface groups remain open

Factory0
Joint / interface0
EPC / site0
Not assigned6
Review an interface schedule

Carry the same split into project documents

Place every assigned owner beside a required input, output, due date, and acceptance record. Match the result across the single-line diagram, equipment list, general arrangement, interface drawings, quotation, packing plan, FAT/SAT schedule, and commissioning plan. Keep labor, tools, lifting equipment, test instruments, temporary power, consumables, permits, and safety control visible. Resolve an open group before it can hide inside another party’s price. Treat a joint group as an interface to define, not as shared responsibility without an owner. Record deviations. Confirm witnesses. Name the energization authority. Preserve the agreed version with the contract file.

Result boundary: the bars count six selected interface groups and make no claim about legal responsibility, project readiness, supplied equipment, site service, price, or schedule. Final quotation and technical agreement control.