Equipment Path Discussion Guide
Compare signals for a single-phase pad-mounted, single-phase pole-mounted, or three-phase distribution route. Scores are discussion prompts, not engineering selection results.
Read the signal carefully
Network availability comes first.
Duty follows.
Physical interfaces can rule out an otherwise attractive option.
Utility practice needs confirmation.
Future loads deserve a credible basis.
A tie is useful because it exposes the decisions that the utility, consultant, owner, and protection study must settle before the equipment request is ready for quotation.
Numbers do not size transformers.
Protection still needs coordination.
Grounding still needs definition.
Engineering review remains mandatory.
1. Available network at the service point
2. Load pattern driving the project
3. Planned physical interface
4. Serving-utility expectation
5. Credible future load
Complete the questions
Pad-mounted signal0
Pole-mounted signal0
Three-phase signal0
Required next step: confirm the route through the utility system, load study, protection coordination, grounding, site plan, clearances, maintenance model, and applicable specification.