Refinery Transformer Interface Register
Use this working record to separate the project baseline from genuine deviations and assign an owner to each open interface. Click any white cell to edit, then print or save as PDF for the RFQ package.
| Group | Interface item | Baseline | Project deviation | Owner | Status / evidence |
|---|---|---|---|---|---|
| Electrical duty | Voltage, frequency and MVA/kVA | Buyer / EPC | |||
| Load profile | Normal, emergency and starting cases | Buyer / EPC | |||
| System | Impedance, fault level and redundancy | Buyer / EPC | |||
| Environment | Ambient, altitude and contaminants | Buyer / EPC | |||
| Hazardous-area interface | Location classification and equipment boundary | Not assumed | Owner / EPC | ||
| Liquid interface | Fluid policy, containment and drainage | Owner / EPC | |||
| Testing | Routine, type, special and witness points | Buyer / Talite | |||
| Documentation | Approval and final document schedule | Buyer / Talite | |||
| Commercial | Quantity, delivery term and target window | Buyer / Talite |
This register is an RFQ coordination aid. Applicable standards, contractual acceptance criteria and site-safety decisions remain project-specific.