Submittal control
Transformer Approval Evidence Register
Track the minimum evidence needed to move a transformer order from design review through release and acceptance. Statuses describe your project record only and do not claim that a document has been supplied by Talite.
Accepted evidence
0%
Status logic
- Required: identified but not submitted
- Submitted: received, review pending
- Accepted: reviewed for the project stage
- Hold: discrepancy blocks progression
| Evidence item | Typical control point | Project status |
|---|---|---|
| Approved technical data sheet | Bid alignment | |
| General arrangement and interface drawing | Design approval | |
| Nameplate and rating diagram | Design approval | |
| Control, alarm and wiring schematic | Design approval | |
| Bill of materials or component schedule | Design freeze | |
| Quality plan and inspection/test plan | Pre-production | |
| Routine test procedure and acceptance criteria | Pre-test | |
| Special or witnessed test procedure | Pre-test | |
| Routine test report | Release | |
| Packing, lifting and transport plan | Shipment release | |
| Installation, operation and maintenance manual | Site readiness | |
| Spares and final document index | Handover |
Open controls
- Set the current status for each evidence item.