Compact Substation Assembly-to-Site Handoff Register

Assign a responsible party to each decision line. “Joint review” is useful during design, but replace it with one accountable owner before release.

Decision line What must be closed Responsible party
Utility interface Voltage, frequency, connection rules and approvals
Load basis Demand, diversity, expansion and 2000 kVA reference fit
Protection Fault level, earthing and protection philosophy
Internal assembly Equipment scope, internal connections and auxiliaries
Enclosure Indoor/outdoor site, temperature, corrosion, pollution and ingress need
Civil interface Foundation, footprint, door swing, clearances and lifting route
Cable interface Entry direction, trench, cable data and termination boundary
Site works Earth connection, drainage, flood protection and public access
Evidence Document list, review status and acceptance criteria
Site release Delivery, unloading, installation, testing and commissioning ownership
0 Talite
0 Buyer
0 Utility / site
10 Open / joint

Register summary

10 decision lines are still open.