PROCESS / 02
Compact Substation Assembly-to-Site Handoff Register
Assign a responsible party to each decision line. “Joint review” is useful during design, but replace it with one accountable owner before release.
| Decision line | What must be closed | Responsible party |
|---|---|---|
| Utility interface | Voltage, frequency, connection rules and approvals |
|
| Load basis | Demand, diversity, expansion and 2000 kVA reference fit |
|
| Protection | Fault level, earthing and protection philosophy |
|
| Internal assembly | Equipment scope, internal connections and auxiliaries |
|
| Enclosure | Indoor/outdoor site, temperature, corrosion, pollution and ingress need |
|
| Civil interface | Foundation, footprint, door swing, clearances and lifting route |
|
| Cable interface | Entry direction, trench, cable data and termination boundary |
|
| Site works | Earth connection, drainage, flood protection and public access |
|
| Evidence | Document list, review status and acceptance criteria |
|
| Site release | Delivery, unloading, installation, testing and commissioning ownership |
|
0
Talite
0
Buyer
0
Utility / site
10
Open / joint
Register summary
10 decision lines are still open.