RFQ Input Completeness Check

Scores an enquiry against the fields that have to be present before two quotations can be compared on the same basis. Fields marked critical are the ones that change the design rather than the paperwork.

Electrical duty
Site boundary
Evidence and commercial scope

Tick what you already have, then press Score.

Why the six critical fields are treated differently

Capacity, both voltages, frequency, required impedance, the installation constraint and the test scope all change what gets built. Two suppliers quoting without them are not quoting the same transformer, and the difference shows up at drawing approval rather than at the quotation stage. The remaining eleven fields change paperwork, packing or schedule, and can be confirmed after the design is fixed.

Send Your Electrical Schedule