Three-Phase Transformer Capacity & Current Planning Estimator
Convert a balanced three-phase line voltage and design current into a preliminary capacity requirement. This planning result is not a protection study or final transformer selection.
Enter the design load
Planning result
Formula used
Talite’s supplied material states a 45–12,000 kVA manufacturer range. A result inside that envelope still requires confirmation of ratios, feed, front type, impedance, BIL, protection, fluid, losses and standards.
Use the result responsibly
Balanced loading is assumed.
Motor starting may govern.
Demand current belongs in the input, not a guessed connected-load total.
Harmonics can change heating.
Future expansion needs an agreed basis.
Utility rules may restrict the available ratings, impedance, taps, connections and protection even when the calculated capacity sits inside a manufacturer’s published envelope.
Primary-side current requires the primary line rating.
Secondary-side current requires the secondary line rating.
Single-phase calculations use a different relationship.
Short-circuit duty remains outside this screen.
Voltage drop needs a system study.
Ambient temperature and altitude can affect the approved design, while enclosure conditions, cable interfaces and installation clearances introduce separate decisions that no capacity formula resolves.
Nameplate selection follows engineering review.
Standard sizes are not inferred here.
Round the result only after the project team confirms its selection policy.
Protection settings come later.
Record the calculation basis with the RFQ.
Recalculate after a material load change.
Talite can then review the complete specification rather than one isolated number.
For mixed motor, electronic and heating loads, preserve the underlying schedule because two projects with the same displayed current can impose very different starting, harmonic, thermal and continuity requirements on the selected equipment.
During early planning, the output can expose a capacity mismatch quickly, yet procurement should wait for the engineer to reconcile diversity, growth allowance, redundancy philosophy and the operating scenarios used to establish design demand.
Where multiple transformers share a campus or industrial network, individual-unit loading also depends on switching states, tie arrangements and contingency operation rather than the normal-state current entered into one screen.
After the rating is shortlisted, the one-line diagram must carry enough detail for winding connections, neutral treatment, cable interfaces, surge protection and fault-current assumptions to be reviewed together.
Because the manufacturer envelope spans several regulatory and standards boundaries, capacity alone cannot establish which efficiency class, construction standard, evidence package or approval route applies to a proposed unit.
Before issuing a purchase order, align this preliminary result with the approved load study, utility requirements, project specification, supplier drawings and the final schedule of guaranteed technical particulars.