Rate what a supplier has actually provided, not what the proposal says will be available later. Use the open items as a clarification list before commercial alignment.
Project values, assumptions, deviations and revision status are traceable.
Applicable editions, purchaser rules and local conformity boundaries are stated.
Requested calculations and approval milestones are identified.
Loss basis, measurement point and contractual treatment are explicit.
Tests, sequence, hold points, notice periods and acceptance rules are listed.
Report content, format, sign-off and exception handling are defined.
Outline, terminals, accessories, civil loads and connection details are covered.
Shipping split, route limits, preservation and receipt checks are addressed.
Supplier, contractor and owner responsibilities are separated.
Start point, exclusions, response route and spare-parts scope are reviewable.
Score each row using the evidence currently available to the buyer team.
No evidence supplied
Claim or promise only
Partial evidence with open gaps
Reviewable project evidence
Controlled & contract-ready evidence
A low score creates a clarification task, not an automatic supplier rejection. Buyer teams should attach each score to the evidence revision they reviewed. Technical acceptance remains separate from document completeness.
Note: This score describes document completeness, not transformer quality, supplier capability or technical compliance. The purchaser remains responsible for qualification, design review and contractual acceptance.