Get in touch with Talite Transformer Co., Ltd Company
Port Load Demand Worksheet
Convert a connected-load estimate into a planning kVA value using your own demand factor, power factor, and growth allowance. This worksheet creates an engineering input; it does not select a transformer rating or replace a system study.
Planning result
Diversified load
800 kW
Base apparent power
889 kVA
With growth allowance
1,067 kVA
Use the planning value with duty cycle, starting current, harmonics, redundancy, utility limits, and future operating modes.
Send This Load Basis for Engineering ReviewFormula: connected kW × demand factor ÷ power factor × (1 + growth allowance). Entering zero or incomplete values returns a validation message rather than a product recommendation.

![Pad-Mounted Transformer: How It Works [2026 Guide]](https://toplit-transformer.com/wp-content/uploads/2026/08/pad-mounted-transformer-guide-featured-150x150.png)


![Single Phase Pad Mounted Transformer Guide [2026]](https://toplit-transformer.com/wp-content/uploads/2026/08/single-phase-pad-mounted-transformer-guide-featured-1-150x150.png)