Grid Interface Evidence Checklist

Use this four-layer list to define the transformer approval trail before order release.

Four-layer approval trail

1. Approved design basis

  • Project specification
  • Single-line diagram
  • Transformer datasheet
  • Inverter or turbine data
  • Compliance and deviation schedule

2. Manufacturing release

  • General arrangement drawing
  • Connection and terminal drawing
  • Accessory schedule
  • Inspection and test plan
  • Approved witness points

3. Factory acceptance

  • Winding resistance
  • Voltage ratio and vector group
  • Impedance voltage
  • No-load and load losses
  • Dielectric tests
  • Special/type tests when specified

4. Handover

  • Serial-linked test reports
  • Final drawings and nameplate
  • Packing list
  • Handling and storage instructions
  • Installation and maintenance manual
  • Closed punch list