Prefabricated Substation Project Input Readiness Calculator
Mark the information already available for your RFQ. The score measures input completeness only; it is not an engineering approval or equipment-sizing result.
Check the inputs you can provide
Start with the information you already have
Unknown items can stay open, but naming them now makes quotations easier to compare.
Still open
- All 10 input groups
How to use the score
Begin with any drawing or schedule already approved by the project team. Mark an input group only when you can attach its value, file, or stated unknown to the inquiry. A 100% result means the ten topic groups have an answer; it does not show that the values are technically complete, mutually compatible, accepted by a utility, coordinated with available fault current, covered by the named standard, included in a supplier’s commercial boundary, or sufficient to release equipment for manufacture. Engineering review still controls the proposed configuration.
Result boundary: one point is awarded for each completed input group. Talite must review the actual single-line diagram, ratings, site conditions, standards, and interface scope before proposing a configuration.