Amorphous-Core Project Fit Screen
Use six project questions to decide whether an amorphous option is ready for a same-scope comparison or whether the procurement team should remain core-neutral until missing evidence is supplied.
1. Applicability
Has the equipment category, destination standard, evaluation point, and compliance date been confirmed?
2. Energized schedule
Which description best matches the expected duty?
3. Loading pattern
What is known about the operating load profile?
4. Loss evidence
Are guaranteed no-load and load loss available for both options under the same reference conditions?
5. Physical and mechanical fit
Have outline, mass, handling, sound, impedance, and short-circuit duty been screened?
6. Proof and commercial boundary
Are the material records, test route, documents, schedule basis, warranty, and service scope defined?
Recommended next actions
This screen does not select a transformer model or determine legal compliance. Final selection requires the applicable specification, system study, supplier data, and agreed evidence.